quality inspection

當(dāng)前位置: 首頁 > process flow > quality inspection

Quality standards and testing standards of the bidding products

(1) Before the ductile iron pipe and pipe fittings are delivered, the supplier's technical supervision department shall inspect and accept the factory, and the factory inspection report shall be submitted to the Employer upon delivery.

(2) Ductile iron pipes and pipe fittings shall be inspected and accepted in batches, and each batch shall be composed of ductile iron pipes and pipe fittings with the same nominal diameter, the same interface form, the same thickness grade classification, the same size and length and the same annealing system.

(3) The size, surface quality, hydrostatic test and anti-corrosion coating quality of the ductile iron pipe and pipe fittings shall be inspected one by one and comply with the provisions of ISO2531 standard.

(4) The weight of ductile iron pipe and pipe fittings shall be sampled and inspected according to the ISO2531 theoretical weight.

(5) The mechanical properties of ductile iron pipe and pipe fittings shall be tested according to the requirements of ISO2531 or GB / T13295.

(6) The size and shape of the ductile iron pipes and pipe fittings shall be measured by using calipers, samples or other measuring tools with 1 / 10 mm accuracy.

(7) The surface quality and anti-corrosion coating quality of the ductile iron pipe and pipe fittings shall comply with the international standards ISO 4179, ISO8179 and the relevant standards and specifications of the People's Republic of China, and the zinc content shall not be less than 99%, and the weight of the sprayed metal zinc layer shall not be less than 130g / m2.

(8) The chemical analysis of ductile iron pipes and pipe fittings shall be conducted in accordance with the Chemical Analysis Methods of Iron and Steel and Alloys.

(9) Before coating the anticorrosion layer, each straight pipe and pipe fittings adopt a reliable method according to the requirements of ISO2531 or GB / T13295, and the hydraulic test is carried out in the factory. Before the test, the outer surface of the straight pipe and pipe fittings should be dry, and the pressure stabilization time is not less than 15 seconds, and no leakage, sweat or other unqualified phenomena.

List of routine testing methods

order number

Online quality control

Detection content

The detection party

Related equipment configuration

 

remarks

1

Iron water furnace

Five elements,

Spectrum fast

Vacuum for straight-read spectra

 

/

2

electric stove

Graphite grade

Online measurement

metallographic microscope

 

/

3

electric stove

Ball grade

Online

measurement

metallographic microscope

 

/

4

After returning to the stove

extensibility

Stretch test

Universal pull, force test

 

/

5

After returning to the stove

tensile strength

Stretch test

Universal pull, force test

 

/

6

After returning to the stove

hardness

Hardness test

sclerometer

 

/

7

After returning to the stove

The wall of the tube is thick

Online measurement

Gamma-ray thickening measurement

 

/

8

After returning to the stove

radial deviation

measure

The radial jumper

 

/

9

After returning to the stove

Joint seal

Type test

Type test machine

 

/

10

After returning to the stove

water gage

Water pressure test

hydrostatic testing machine

 

/

11

After returning to the stove

Flange size

measure

vernier calipers

 

/

12

After returning to the stove

straightness

measure

Laser level, surface measurement

 

/

13

After returning to the stove

glancing flatness

measure

Laser level, surface measurement

 

/

14

After returning to the stove

Cementlining layer

measure

coating thickness gauge

 

/

15

be put in storage

Outside spraying

measure

coating thickness gauge

 

/

16

be put in storage

Spray mark

observe

Quality officer

/

17

be put in storage

ovality

measure

vernier calipers

/

18

be put in storage

surface quality

observe

Quality officer

 

/

19

be put in storage

retaining ring

measure

vernier calipers

 

/

20

be put in storage

Internal diameter error

measure

inside caliper gage

 

/

21

be put in storage

External diameter error

measure

vernier calipers

 

/

22

despatch

Loading cushion

observe

Quality officer

 

/

23

despatch

Bundle broadband

observe

Quality officer

 

/

24

be put in storage

Rubber circle hardness

measure

Shaw hardness instrument

 

/

25

be put in storage

Rubber circle pull    force

Pull test

tensile machine

 

/

26

be put in storage

Rubber circle thickness

measure

Thickness meter

 

/

27

be put in storage

The rubber ring aging

measure

ageing oven

 

/

28

be put in storage

The rubber ring is low

measure

Low temperature experimental box

 

/

29

be put in storage

ozone proof

experiment

Ozone resistance, experimental machine

 

 

/

30

be put in storage

Rubber circle index

experiment

vulkameter

 

/

31

be put in storage

Rubber circle index

experiment

Meni viscosity meter

 

/

32

be put in storage

Rubber circle index

experiment

projector

 

/

Latest product

Industry dynamic

National service hotline

Manager Chen 153-4729-4726

0714-3280366

record:ICP forHubei Province20006416-2 All rights reserved:Hubei yitong casting industry co